In the early morning hours, the 10-ton press was loaded in Germany to begin its journey to Rotterdam. Upon arrival, it was unloaded with a mobile crane and then—taking floor load limits into account—carefully placed in its final position using the hydraulic lifting system. Due to the limited space available, a three-point setup was required.
Road, water or air. In the Netherlands or far beyond. No cargo too large, no destination too far. Do you have a logistical challenge? Our professionals like to take this to the test. Please contact us to discuss the options. We are happy to help you!